Bristol Airport Runway Maintenance

Client
Bristol Airport
Duration
5 Night Shifts

Lagan Airport Maintenance have delivered essential runway maintenance works at Bristol Airport.

Works included:

  • 169m of 40mm wide asphalt joint saw cutting and sealing
  • 191m of 200mm wide Maxiflex joint repairs
  • 16m of 500mm wide Maxicrete patch repairs

Our dedicated team worked closely with Airfield Operations and Security to ensure the smooth running of the works within a busy airport environment. All works were self-performed and were undertaken in short night time possessions.

The team are pleased to report that they delivered the project within the required timeframe and had zero accidents or incidents throughout the works.

“Bristol Airport has a long standing relationship with Lagan and have completed many projects together over many years. Lagan’s helpful and flexible approach to both the planning and execution of the recent runway maintenance package ensured the works were completed to an extremely high standard, on time and on budget with practically zero operational impact. I would have no hesitation in recommending Lagan Airport Maintenance for work of this nature anywhere where excellent value, high quality work is required in high risk operational landscapes.”
Rob O'Dare, Airfield Technical & Compliance Manager, Bristol Airport